The page begins here.

The following are links to help you navigate around the site.

The main content of this page begins here.

For Less Lead Time

Vehicle manufacturing company P

Need/Expectation:

  • Reduce lead time with cost efficiency

Result:

Reduced lead time

Before
  • Expensive domestic land transportation after arriving at port to final destination
    (Air shipment is much more expensive and ocean shipment requires a longer lead time than land transportation)

The VANTEC solution

Nonstop multiple transportation utilizing Siberian Railroad

Proposed special packaging specifications enabling an easy switch from flat container to railroad container with a competitive price provided by partnership with a local logistics company have strength for intermodal transport in Russia.

After

Shortened lead time from port to final destination after arrival from Japan by utilizing Siberian Railroad.

To Inquiry regarding service/solution

Inquiry Form

The page ends here.